McLean VA VDOT Apron & Driveway Expansion | Fairfax County Concrete Contractor

A single-wide VDOT apron in McLean, VA expanded to a double-wide entrance, with a non-compliant curb and gutter brought back into code and the sidewalk regraded, behind a paver driveway another contractor had already installed.

McLean VA VDOT Apron & Driveway Expansion | Fairfax County Concrete Contractor (video)

Filmed on site by Tuck. Watch on YouTube or see all project videos.

Project at a glance

City / CountyMcLean, VA (Fairfax County)
JurisdictionVDOT Land Use Permit (LUP-PE), state-maintained street in Fairfax County
ScopeVDOT apron expanded from single-wide to double-wide; curb and gutter replaced to code; pedestrian access route regraded to the 2% maximum cross-slope; tie-in to the existing paver driveway, with the existing pavers reset and the grade corrected to meet the new apron
Materials & brands4,000 PSI concrete in a 7-inch apron slab, no steel reinforcement per the VDOT detail; the homeowner's existing pavers reset to the new grade
VideoVideo published February 2026

About this project

At this McLean, Virginia estate the previous contractor had installed a paver driveway but left the VDOT apron and sidewalk elevations alone. We expanded the single-wide apron to a double-wide entrance and brought a non-compliant curb and gutter back into code, syncing the street, the new apron and the existing paver driveway. We also reset the homeowner's existing pavers, installed by the earlier contractor, and corrected the grade so the driveway meets the new apron; that paver work was only needed because the driveway and the apron were split between two contractors.

Why the apron should come first

The VDOT curb, gutter and sidewalk along the street often sit higher than the driveway behind them. In the video, another contractor laid a paver driveway before the apron was touched. With the driveway height already locked in, the apron couldn't be dropped to ease the steep grade off the street. Had we controlled the whole excavation, we could likely have taken the entire entrance down several inches and removed the hump that bottoms cars out. Doing the apron and driveway in one excavation is about grade control: when we set both elevations together, we can tune the slope across the whole run.

Built to the VDOT detail

Because the apron sits in the VDOT right-of-way, the work ran under a VDOT land use permit. VDOT's approved apron details are plain, unreinforced concrete, and adding steel deviates from the permitted standard, so this apron was poured as a 7-inch slab of 4,000 PSI concrete over a compacted sub-base with no steel. Where the public sidewalk runs through the apron, the pedestrian access route was regraded so its cross-slope does not exceed 2%. In our experience these reviews commonly take one to two months, and the disturbed ground around the new apron has to be restored and stabilized with established grass before VDOT signs off and releases the surety.

Related pages

Planning a project like this one?

Tell us about your property and what you want it to do. Tuck plans and manages every project himself, and we handle the design, permitting and installation as one firm.

703-540-1000 Request an Estimate