What did Tuck GC build in Falls Church, VA?
Tuck GC, Inc., a Class A (RBC #2705160024) design-build contractor, rebuilt the driveway and front entrance of a new custom home in the Fairfax County part of Falls Church, where the builder had left the old single-wide apron. The driveway is now about 20 feet wide for two cars, with a double-wide VDOT apron about 19 feet wide, built under a VDOT Land Use Permit; the public sidewalk was moved back for a gentler slope, and the VDOT inspector approved a CG-9B radius to clear a water meter found days before the pour. At the front door, narrow wood steps gave way to steps about 8 feet wide and a raised 12-by-12-foot landing on a footing with piers and rebar, finished in thermal bluestone treads, Pennsylvania flagstone and Coyote Gray ashlar.

Filmed on site by Tuck. Watch on YouTube.
Case Study: A New Home, an Old Apron and a Front Entrance That Did Not Fit
The homeowners had a beautiful new custom home in Falls Church, in the Fairfax County part of town where the streets are VDOT's. The builder poured a double-wide driveway but left the original skinny, single-wide apron at the street, so two cars had to squeeze through a one-car entrance. The driveway concrete was only a few years old and was already spalling. This was not the odd pop-out you see on most driveways; the damage ran across the surface, and in our view it came from a defect in the concrete or the way it was put in.
We took out the entire driveway and rebuilt it in concrete, about 20 feet wide so it fits two cars side by side, with a new double-wide VDOT apron about 19 feet wide at the street. At the front door, the plan was a simple landing. Once the old work was out, we and the homeowner agreed the whole entrance needed to be rebuilt, and it became the other half of this job.
| Project at a Glance | Details |
|---|---|
| Location | Falls Church, VA, in Fairfax County (not the City of Falls Church) |
| Jurisdiction | VDOT Land Use Permit for the apron and public sidewalk |
| Before | A new custom home with the old single-wide apron, a double-wide driveway already spalling after a few years, and narrow wood steps with a small wood landing at a large stone porch |
| Driveway | Old driveway removed; new concrete driveway about 20 feet wide, for two cars |
| Apron | New double-wide VDOT apron about 19 feet wide, CG-9B radius, set back about 8.5 feet from the flow line; slightly narrower than first planned to clear a water meter |
| Public sidewalk | Moved back to meet the deeper apron and angled on each side to keep the walking route connected |
| Front entrance | Raised landing about 12 by 12 feet, on a footing all the way around with piers and rebar; new steps about 8 feet wide, up from about 4 feet |
| Stone | 2-inch premium thermal bluestone treads on the steps and the landing's edge; Pennsylvania natural cleft flagstone, full range color, French pattern 2, in the landing; Coyote Gray ashlar on the risers and the stoop's exposed concrete |
| Completed | Summer 2026 |
Why Moving the Sidewalk Made a Better Apron
This lot had an unusual layout. The public sidewalk sat only about 6 feet from the flow line of the gutter, with a skinny 2-foot utility strip, while the property line ran about 12 feet back from the flow line. An apron that stops at a sidewalk 6 feet from the street is short, and a short apron is steep: cars climbing it can bottom out. Pushing the apron all the way back to the property line would have looked out of place on the street.
So we worked it out with VDOT and set the back of the apron about 8.5 feet from the flow line. We moved the public sidewalk back to meet it and angled the sidewalk on each side, a dog-leg, so it still connects to the sidewalk on each side. That keeps a pedestrian access route across the driveway, and the longer apron rises more gently from the street, so the homeowners' cars do not scrape. More on the permit side is on our Fairfax County VDOT apron page.
The Water Meter Hidden Under the Dirt
The apron as permitted had a modified radius on the larger CG-9D detail, a little wider than what we built. A few days before construction, when the utilities were marked, a water meter turned up right where the apron had to go. It was buried under the dirt with nothing showing, and nobody knew it was there. As drawn, the apron would have forced us either to have the meter moved or to put the job on hold.
We called the VDOT inspector, explained what we had found, and he gave us the go-ahead to build a slightly narrower apron with the smaller CG-9B radius, which just clears the meter. The meter stayed exactly where it was, in the grass beside the apron. A short form and a revision covered the change, and the install went ahead on schedule. Our VDOT inspectors pick up when we call and work through problems like this with us, and on this job that saved the schedule. The CG-9B and CG-9D details are explained on our VDOT apron page.
The Driveway and Apron, Step by Step
- Full Removal The spalling driveway, the old single-wide apron and the sidewalk in front of it came out.
- A Driveway for Two Cars The new concrete driveway is about 20 feet wide. See our driveway widening and concrete driveways pages for how we build them.
- The Double-Wide VDOT Apron About 19 feet wide with the CG-9B radius, ending about 8.5 feet from the flow line, built under the VDOT Land Use Permit and inspected by VDOT.
- The Public Sidewalk New concrete sidewalk set back behind the apron, angled at each end to tie into the existing walk.
The Front Entrance: From Narrow Wood Steps to Stone
The house has a big stone front porch, but it was reached by narrow wood steps, about 4 feet wide, and a small wood landing. Bushes around it hid how out of place it looked. The builder had also run a thin strip of stone along the top of the porch's sides and left the concrete below it bare.
The plan was a landing about 12 by 12 feet outside the wood steps. Once the old work was out and we shot the grades, the levels did not work: the landing would have needed a step down from the driveway, or the steps would have been partly buried below grade. We showed the homeowner, and he agreed to a change order on the spot: raise the landing and rebuild the steps the full width of the porch.
- A Raised, Structural Landing We built the landing higher, about 12 by 12 feet, with a footing all the way around, piers and rebar, so the raised landing is built as a structure.
- Wider Steps We took some of the railings off the porch and built new steps about 8 feet wide, double the old ones, so the entrance is in proportion with the house.
- Thermal Bluestone Treads 2-inch premium thermal bluestone treads on every step and around the edge of the landing. More on treads and stoops is on our stone stoops and steps page.
- A Flagstone Landing Pennsylvania natural cleft flagstone, full range color, laid in French pattern 2 in the middle of the landing. See our flagstone patios page for the same stone on patios.
- Coyote Gray Ashlar on the Verticals We took off the builder's thin strip of stone and covered the step risers and all the exposed concrete sides of the stoop in Coyote Gray ashlar. We left the top of the stoop alone; the builder had already laid flagstone there. More on this kind of work is on our stone veneer page.
The result is a true front entrance: wide stone steps up to the porch, a raised flagstone landing, and stone over every face of the stoop that used to show bare concrete.
Falls Church Driveway and Stone Steps FAQ
Who issues the permit for a driveway apron in Falls Church?
It depends on which Falls Church. Inside the City of Falls Church the apron needs a right-of-way permit from the city's Department of Public Works. In the Fairfax County part of Falls Church, where this job is, the street is VDOT's, so the apron needs a VDOT Land Use Permit. We handle that permit as part of the job.
What happens if a water meter is in the way of a new driveway apron?
Usually the choice is to move the meter, which adds cost and time, or change the apron. On this Falls Church job the meter was buried under the dirt and only turned up a few days before construction, when the utilities were marked. We called the VDOT inspector, and he approved a slightly narrower apron with the smaller CG-9B radius that just clears the meter. The meter stayed where it was, in the grass beside the apron.
Why move the public sidewalk back when widening an apron?
On this lot the sidewalk sat only about 6 feet from the gutter's flow line, so the apron would have been short and steep, and cars could bottom out. With VDOT's agreement we set the back of the apron about 8.5 feet from the flow line and moved the public sidewalk back to meet it, angling it on each side so the walking route still connects. The longer apron has a gentler slope.
Why build a raised landing on a footing under stone steps?
Once the old driveway was out and we shot the grades, the planned landing would have needed either a step down to it or steps partly buried below grade. We raised the landing instead, and because it is now higher, we built it as a structure: a footing all the way around, piers and rebar, with the stone set on top.
What stone is on these Falls Church front steps?
2-inch premium thermal bluestone treads on the steps and around the edge of the landing, Pennsylvania natural cleft flagstone in full range color laid in French pattern 2 in the middle of the landing, and Coyote Gray ashlar on the step risers and the exposed concrete sides of the stoop. These are natural stones, not a manufactured brand.
Planning a Driveway or Front Entrance in Falls Church?
If your apron is too narrow for your driveway, your concrete is failing early, or your front steps do not match your house, we can look at all of it together, permit included. Call 703-540-1000 or reach us through the contact page.
See our Fairfax County VDOT aprons, driveway widening, stone stoops and steps, more Falls Church projects or all our projects.